ERTEC Zambia Ltd

Engineering Excellence Across the Energy Sector Zambia has been a major focus for ERTEC LTD’s expansion in electrical and transmission line projects.

ERTEC LTD Burundi

Key Achievements:

  • 330kV transmission line construction from Chambishi to Mufulira.
  • Installation and commissioning of substation systems in Kitwe and Chongwe.
  • Electrification projects in Mponwe District.
  • Collaboration with ZESCO and international partners on power transmission upgrades.

2017

Installation Testing & Commissioning of2x52MV A, 132/88/33 kV chongwe substation – Zambia Installation Testing & Commissioning of Indore 33kV GIS switchboard at Liverpool Substation – Zambia Installation Testing & Commissioning of2x26MVA, 33/1 lkV Substation Makeni – Zambia Testing & Commissioning of Kabulonga Chelstone Melero L85 chongwe Town Chalala & Bonaventure 33/1 lkV substation & New Ndeke 66/1 lkV Substation –ZAMBIA

12 Months

EISEWEDY ELECTRICAL/ UZESCO

Tower Erection & Conductor & OPGW stringing for 330kV Line from Chambishi copper smelter to Muufulira substation Zambia Installation Testing & Commissioning of2x52MV A, 66/33kV Substation at Mwambashi in Kitwe – Zambia

12 Months

EISEWEDY ELECTRICAL/ UZESCO

2015

Installation of 125MV A/330/132-88 at Kafuye Town substation ZAMBIA

6 Months

ZESCO/EMCO

Copabelt electrification : Mponwe district: 19 km MV llKV line and 5 km of over head Low voltage distribution with three transformers of 100KVA,11KV/0.4KV

12 Months

REN/ZAMBIA

Current Focus in Zambia

  • High-voltage substation installations.
  • Advanced transmission line development.
  • Renewable energy integration into the national grid.
our current focus