ERTEC LTD delivers sustainable energy solutions through the construction of hydroelectric and solar power projects. Our services cover the full project cycle—from feasibility studies and design to supply, installation, and commissioning. Our services cover the full project cycle—from feasibility studies and design to supply, installation, and commissioning. We aim to provide clean, efficient, and reliable energy infrastructure that supports national development and environmental goals across the region.
2024
RFP number: LRFP-CAR-2024-9189695: Solar electrification of
the 2 vaccine storage depots – at Berberati and Bossangoa
Ongoing
UNICEF RCA Office, Bangui 1 Rue Joseph Degrain
2023
Construction of 90 kV Line Solar power plant to Nkok
Substation
Ongoing
Arise – Société d’Energie et d’Eau du Gabon
Construction of HV/MV Lines associated with the
hydroelectric devlopment of JIJI and MULEMBWE OF 110kV
Under Ground cable work, Ligne 220/110kV Poste KabeziPost RN1.
12 months
KEC/REGIDESO
2022
Construction of 220 KV Double Circuit – Kolye – Gulu
12 months
KEC/UETCL
Construction of 110kV Double Circuit line – Kabu 16 HPP to
Buganda
7 Months
Angelique/REGIDESO
2017
Supply and Install of PV system for 270 Primary Schools in
Ethiopia
8 Months
Ethiopia Ministry of Water& Energy Holley
2016
Supply & Installation 30kV Line , Transformer for Water pump
Station at GAKENKE
3 Months
GAKENKE District/ WASAC
Supply & Installation 30kV Line , Transformer for Water pump
Station at RUNDA Sector
3 Months
Kamonyi District/ WASAC
2012
Manufacture, Supply, Installation, Testing, Commissioning
and Maintenance of photovoltaic power-supply system for
246 secondary schools in Uganda